Room additions
Bump-outs, second stories and opened-up floor plans, engineered and framed so the new part looks like it was always there.
In the price
- Design and engineering
- Permits and plan check
- Foundation work
- Framing and beams
- Roof tie-in
- Windows and doors
- Electrical and HVAC
- Drywall and flooring
- Matching exterior
- Final inspection
Three ways to finish it
Same crew, same schedule, same warranty. What changes is the materials. Sample prices
Standard
Good stock materials
Upgraded
Semi-custom, stone, better fixtures
Custom
Custom cabinets, slab, designer fixtures
Week by week
A typical addition schedule. Yours is built from your bid and updated every Friday.
Sample schedule
- Design + engineering Week 1 to week 4
- Plan check Week 4 to week 9
- Foundation Week 10 to week 11
- Foundation inspection Week 11
- Framing + roof tie-in Week 12 to week 14
- Frame inspection Week 15
- Systems Week 15 to week 16
- Drywall + finishes Week 17 to week 20
- Final inspection Week 21
Questions
Up or out?
Out is usually cheaper per square foot; up keeps your yard. A second story needs the existing foundation checked by our engineer first.
Do we need to move out?
For most bump-outs, no. For a second story, plan on four to eight weeks away while the roof is open.
Will it match the house?
We match siding, stucco texture, rooflines and trim, and we photograph the existing details before we start.
Get a fixed-price bid.
Tell us about the project. We’ll set up a free walk-through, measure everything, and send a line-item bid within a week.