Bathroom remodels
Powder rooms to primary suites: waterproofed right, tiled straight, with the plumbing moved where you want it.
In the price
- Layout and fixture plan
- Permits
- Demo to the studs
- Waterproofing, flood-tested
- Tile, floor to ceiling
- Vanity and counters
- Glass shower enclosure
- Heated floors (optional)
- Fan and lighting
- Final clean
Three ways to finish it
Same crew, same schedule, same warranty. What changes is the materials. Sample prices
Standard
Good stock materials
Upgraded
Semi-custom, stone, better fixtures
Custom
Custom cabinets, slab, designer fixtures
Week by week
A typical bathroom schedule. Yours is built from your bid and updated every Friday.
Sample schedule
- Design + selections Week 1
- Permits Week 1 to week 2
- Demo Week 3
- Rough plumbing Week 3
- Rough inspection Week 4
- Waterproofing + flood test Week 4
- Tile Week 5
- Vanity, glass, fixtures Week 6
- Final inspection Week 7
Questions
How long will we be without the bathroom?
Usually four to six weeks for a hall bath. If it’s your only bathroom, we can phase the work so you have a working toilet every night.
What’s a flood test?
Before any tile goes down, we plug the drain and fill the shower pan with water for 24 hours. If the level doesn’t drop, the waterproofing is good.
Can you turn a tub into a walk-in shower?
Yes, it’s our most common bathroom job. We’ll check the drain location and the floor framing first.
Get a fixed-price bid.
Tell us about the project. We’ll set up a free walk-through, measure everything, and send a line-item bid within a week.
(310) 555-0147