Kitchen remodels
Full gut or layout-only, with cabinets, counters, lighting and appliances handled by one crew and one schedule.
In the price
- Layout and 3D design
- Permits and plans
- Demo and haul-away
- Plumbing and electrical
- Cabinets and counters
- Tile backsplash
- Lighting plan
- Appliance install
- Paint and trim
- Final clean
Three ways to finish it
Same crew, same schedule, same warranty. What changes is the materials. Sample prices
Standard
Good stock materials
Upgraded
Semi-custom, stone, better fixtures
Custom
Custom cabinets, slab, designer fixtures
Week by week
A typical kitchen schedule. Yours is built from your bid and updated every Friday.
Sample schedule
- Design + 3D Week 1 to week 2
- Permits Week 2 to week 4
- Demo Week 5
- Rough plumbing + electrical Week 6
- Rough inspection Week 7
- Drywall + paint Week 7
- Cabinets Week 8
- Counters + backsplash Week 9
- Fixtures + appliances Week 10
- Final inspection Week 11
Questions
Can we keep living in the house?
Yes, almost always. We seal the work area with zip walls, run a HEPA air scrubber and set up a temporary kitchen corner with your fridge and a microwave.
Do you supply cabinets or can I buy my own?
Either. We work with three local cabinet shops, or we install cabinets you buy, as long as we can check the order before it ships.
When do I pay?
A deposit of 10% or $1,000, whichever is less (California’s limit), then payments tied to finished milestones on the schedule. Never ahead of the work.
Get a fixed-price bid.
Tell us about the project. We’ll set up a free walk-through, measure everything, and send a line-item bid within a week.
(310) 555-0147